About Us · Ashland, KY

Ashland Metal Roof Coating Company

A metal roof coating company for commercial buildings in Ashland and nearby towns. We inspect first, fix what needs fixing, and coat the roof.

Crew lead in a logo shirt reviewing roof photos with a building manager
How We Work

How Our Metal Roof Coating Company Works In Ashland

Roofer showing a building owner a seam on a metal roof

We coat commercial roofs: metal first, plus silicone, acrylic, spray foam, and shingle systems where a roof calls for them. Every job starts with an inspection on the roof itself, because the panels, laps, and drainage decide what the roof can take.

Owners get a plain read on the roof: what can be coated, what has to be fixed first, and what needs replacing. Work is then planned around the building, its hours, and the weather.

  • Inspection before any recommendation
  • Fasteners and laps fixed before coating
  • Work planned so buildings stay open
  • Coating days set by the weather

Want A Straight Read On Your Roof?

Call to set up an inspection. You will hear what can be coated, what needs repair first, and what should be replaced.

Inspection Checklist

What We Check On Every Roof

This list runs on every inspection, whatever system the roof ends up with.

  • Every exposed fastener, for stripped, rusted, or backed-out screws and cracked washers

  • Side laps, end laps, ridge caps, and trim joints for split sealant

  • Rust by type: surface haze, heavy scale, white rust, and rust-through

  • Skylight panels for cracks, yellowing, and leaking edges

  • Rooftop unit curbs and pipe boots for open flashing

  • Gutters, downspouts, and scuppers for debris and open seams

  • Low spots where water stands after rain

  • Moisture readings where insulation or condensation is in question

Where We Draw The Line

What We Will Not Do

Some roofs should be fixed or replaced before any coat. These are the cases where we point another way.

  • If Your Roof

    Has Rust Holes Across Most Panels

    Steel with daylight showing through needs new panels before any coat.

    Start WithRe-Paneling First
  • If Your Roof

    Holds Wet Insulation Underneath

    Sealing a wet roof traps the water inside, so soaked areas are cut out and replaced first.

    Start WithDry It Out First
  • If Your Roof

    Carries Shingles With No-Coating Terms

    When the shingle maker voids coverage on coated roofs, we read the terms with you before going ahead.

    Start WithRead The Terms
  • If Your Roof

    Rests On Failing Purlins

    Sagging panels and damaged structure call for a new roof system, and we say so plainly.

    Start WithRoof Replacement

Talk To Us About Your Roof

Get a free estimate and an honest read on whether your roof is ready for a coat.

Call Us (606) 221-5158